  • #46
    Originally posted by Edmonton PRT View Post
    I agree with you Medwards, subpar


    Substandard design changes to leave the bolted plates in place rather than the original seamless welded design

    ...
    Except the finished bridge looks not at all like the photo above.

    Source: https://twitter.com/ExploreEdmonton/...30131699077120

    Also it's good form to credit the photos that you post.

    Comment


    • #47
      Deleted.
      Last edited by SP59; 24-06-2019, 12:35 AM.

      Comment


      • #48
        Originally posted by OffWhyte View Post
        Except the finished bridge looks not at all like the photo above.

        Source: https://twitter.com/ExploreEdmonton/...30131699077120
        Nice picture

        Still see the plates dispite a coat of paint.

        The design was supposed to be smooth welded joints but the contractor cheaped out, did subpar workmanship and the COE let them get away with it.
        Last edited by Edmonton PRT; 22-06-2019, 08:41 PM.
        Advocating a better Edmonton through effective, efficient and economical transit.

        Comment


        • #49
          In French but the gist of it is there could be years of delays and cost blowouts of hundreds of millions.

          https://www.lapresse.ca/actualites/e...-le-tunnel.php