  • It's that new math they teach in school I bet.
    A people that elect corrupt politicians, imposters, thieves and traitors are not victims, but accomplices.

    Comment


    • I'm guessing if the project has a year to go, the expected completion time is 1/(1-.0.3)=1.42 years.
      "Talk minus action equals zero." - Joe Keithley, D. O. A.

      Comment


      • Taking Shape: Valley Line Southeast update 4

        https://transformingedmonton.ca/taki...east-update-4/

        Comment


        • Originally posted by The_Cat View Post
          The primary stated reason for the delay was "a large concrete mass found nine metres below the surface of the North Saskatchewan River" but that was first reported in early 2018--two years ago.

          Comment


          • I'm guessing that the Tawatina Bridge is about 30 percent done (12 or 13 out of 41 sections done). I'm sure we'll see more action with the warmer winter weather returning.
            "Talk minus action equals zero." - Joe Keithley, D. O. A.

            Comment


            • Originally posted by stilicho View Post

              The primary stated reason for the delay was "a large concrete mass found nine metres below the surface of the North Saskatchewan River" but that was first reported in early 2018--two years ago.
              Way to assume the public is stupid. Just because a rock is found - how does that impact the other 12.8km of the LRT line? Maybe I missed the part when the entire project/contruction team converged at the N. Sask River to figure out the "rock" for 3 months.

              Go ahead and blame the rock when every is built except the bridge. But as it stands, there is a A LOT of work remaining - most of it no where near the bridge.

              Comment


              • They were 20% behind schedule before Mystery Scapegoat Rock was found.

                https://www.edmonton.ca/documents/Ro...ard-Q42017.pdf

                A year later they were 27% behind schedule

                https://www.edmonton.ca/documents/Q4..._Dashboard.pdf


                Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

                Comment


                • The first cables are up on the Tawatina brodge
                  "Talk minus action equals zero." - Joe Keithley, D. O. A.

                  Comment


                  • 4 of 28 cable stays installed.
                    i have good pics, but site says I only have 1kb ability to upload!?

                    Comment


                    • You can't upload pictures here. You'll need to use a image hoster like imgur or flickr.
                      A people that elect corrupt politicians, imposters, thieves and traitors are not victims, but accomplices.

                      Comment


                      • ok . trying againhttps://photos.google.com/album/AF1Q...XrzbykaB8bKigI

                        Comment


                        • You need to post the URL into the box that opens when you click the Image button. It's just to the right of the middle of the tool bar and looks like a sun over some mountains.

                          Comment


                          • So there was a train crawling up and down Mill Woods without being towed by the yellow loco. I was behind the wheel and unable to take any pictures, but was wondering if anyone had. I think it's the first time we've had trains running on their own.

                            Comment


                            • Another Milestone! TransEd is pleased to announce the successful movement of the first train under power on the Valley Line. Testing trains are currently traveling along 66 street under the careful operation of TransEd crews and train drivers. #ValleyLine #YegLRT
                              https://twitter.com/yegvalleyLRT/sta...66394198233095

                              Comment


                              • If the rest of line is ready, but the bridge is delayed beyond fall 2020, would they operate the line to Bonnie Doon or Muttart, and then bridge the gap with high-frequency buses to Downtown?