Announcement

Collapse
No announcement yet.

Valley Line LRT | Downtown to Millwoods | Under Construction

Collapse
This is a sticky topic.
X
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Q3 2019 Report: https://www.edmonton.ca/documents/tr...rd_Q3_2019.pdf
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

    Comment


    • Originally posted by Sonic Death Monkey View Post
      98 Ave girder to be installed Nov 30
      http://transedlrt.ca/advisories/98-avenue-road-closure/
      Tonight!
      “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

      Comment


      • Looking at the bridge, it looks like it might be long enough for the first (of eight) wires.
        "Talk minus action equals zero." - Joe Keithley, D. O. A.

        Comment


        • Does anyone know if the big lift over 98th Ave actually occurred on Saturday night. Pictures?

          Comment


          • Originally posted by 2stubborn View Post
            Does anyone know if the big lift over 98th Ave actually occurred on Saturday night. Pictures?


            would say yes https://www.reddit.com/r/Edmonton/co...o_crews_could/

            Comment


            • I drove under the 98 Ave girder yesterday, and then back the other way.  Such a beauty!  
              “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

              Comment


              • With the exception of the northernmost segment, the entire south approach to the bridge is now complete. Not sure why they seem to be delaying the pour on that final segment.

                Comment


                • Looks like the Tawatina Bridge added another two sections (north and south).
                  "Talk minus action equals zero." - Joe Keithley, D. O. A.

                  Comment


                  • I have no idea what you guys are talking about. I looked at the Tawatina Bridge while coming down the hill along 98 Ave today and I don't see any progress.
                    *** Pics or it's not happening. ***
                    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

                    Comment


                    • Take a picture and compare it with older ones.
                      "Talk minus action equals zero." - Joe Keithley, D. O. A.

                      Comment


                      • You're the one who keeps claiming progress on this bridge - you take pics and post them here. Why should I be doing all your work for you?
                        “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

                        Comment


                        • I'm lousy at taking pictures. However, looking at the dimensions of the bridge pier, the cross seems to be getting wider. Perhaps some pics will be posted soon.
                          "Talk minus action equals zero." - Joe Keithley, D. O. A.

                          Comment


                          • Valley Line LRT to Mill Woods delayed a further 6 months, documents say

                            13-kilometre line expected to open in summer 2021 instead of December 2020

                            https://www.cbc.ca/news/canada/edmon...-lrt-1.5390065
                            “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

                            Comment


                            • Valley Line delayed six months:
                              https://edmontonjournal.com/news/local-news/lrt-delay
                              "Talk minus action equals zero." - Joe Keithley, D. O. A.

                              Comment


                              • How a three year+ project being 30% behind schedule works out to only a 6 month delay is some funky math. I
                                Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

                                Comment

                                Working...
                                X