Announcement

Collapse
No announcement yet.

Valley Line LRT | Downtown to Millwoods | Under Construction

Collapse
This is a sticky topic.
X
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Hopefully it can be done quickly.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

    Comment


    • The real question is: what's the wind speed forecast?

      Comment


      • Not just the wind, but visibility if snowfall is heavy.
        I am in no way entitled to your opinion...

        Comment


        • Between 97 and 99 St and 102 Avenue they were pouring the curbs and sidewalks this morning. Hopefully some of the road can be done and opened up again soon.
          My antidepressent drug of choice is running. Cheaper with less side effects!

          Comment


          • Originally posted by Sonic Death Monkey View Post
            https://twitter.com/yegvalleyLRT/sta...58695540441088
            Reminder that the span over Argyll Road will be installed Friday night, November 8. Signals will be removed at 7:00 p.m. and Edmonton Police will be directing traffic. Full closure will begin at 9:00 p.m. reopening at 6:00 a.m. Details here: https://bit.ly/33ofIup
            Hope someone out there gets some pics.

            Comment


            • Good luck getting this done, TransEd!
              "Talk minus action equals zero." - Joe Keithley, D. O. A.

              Comment


              • Just passed by there a few minutes ago and they are getting things ready.
                LRT is our future, time to push forward.

                Comment


                • Anyone know if the ramp installation finished OK last night and this morning? Any pics?
                  “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

                  Comment


                  • It was done. See pics here: https://edmonton.skyrisecities.com/f...4/post-1499208

                    Comment


                    • Final segment at Argyll Rd / 83 St is done.

                      Comment


                      • Since were Canadians, shouldn’t it say Railway Crossing? (Who was it that lectured us on that?)

                        Note the sign here says Railway.
                        https://www.tc.gc.ca/eng/railsafety/...ndards-325.htm


                        “A railway crossing sign at Heritage Park, Alberta, Canada”

                        https://www.alamy.com/stock-photo-a-...104574465.html
                        Last edited by KC; 09-11-2019, 12:39 PM.

                        Comment


                        • Originally posted by KC View Post
                          Since were Canadians, shouldn’t it say Railway Crossing? (Who was it that lectured us on that?)

                          Note the sign here says Railway.
                          https://www.tc.gc.ca/eng/railsafety/...ndards-325.htm


                          “A railway crossing sign at Heritage Park, Alberta, Canada”

                          https://www.alamy.com/stock-photo-a-...104574465.html
                          Either / or. I kind of like railroad on these myself. Besides, it matches four letters on each side.
                          Just enjoying another day in paradise.

                          Comment


                          • And the bonus is that it’s getting us ready for our separation and eventual absorption by the US.

                            Comment


                            • https://flic.kr/p/2hHuE56
                              LRT is our future, time to push forward.

                              Comment


                              • It's a warning sign mostly for bikes and motorcyclists (before the snow) to be careful. Probably some cheap surplus signs they found before they get the gates and official signs (red and white with no words) up.

                                Comment

                                Working...
                                X