Announcement

Collapse
No announcement yet.

Edmonton Construction Projects, Proposals and Rumours 2

Collapse
This is a sticky topic.
X
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Edmonton Construction Projects, Proposals and Rumours 2

    **EDMONTON METRO REGION PROJECTS, PROPOSALS, RENDERINGS AND RUMOURS**



    Renderings and new information (such as rumours, proposals, approvals, etc) are added to this first page on a regular basis, as it becomes available. Information that needs updating or changing status, please PM or add it in the discussion thread.
    Press "Ctrl-F" if you want to search for projects within this page
    Press "Esc" if you want quit loading all the numerous images on this thread.
    Press "Ctrl+F5"If some images do not load right away, this will refresh your Web Browser


    Edmonton Information:
    City Population – 812,201 (2011) Edmonton
    CMA Population - 1,159,869 (2011)Edmonton Capital Region
    Incorporation as Town - 1892 Incorporation as City - 1904
    Total Area- 683.88 km² (2004)
    Elevation– 688 m above sea level
    Total Area of Parks/Open Spaces - 111 km² (27,400 acres) of parkland. Within a 25 km long river valley park system there are 11 lakes, 14 ravines, and 22 major parks.

    Branding/Motto - "City of Champions" "Gateway to the North" "Oil Country"
    Mayor – Stephen Mandel (34th Mayor of Edmonton)
    Last Municipal Election- Oct. 18, 2010
    Next Municipal Election - Oct. 17, 2013



    **COMMERCIAL AND GOVERNMENT HIGH RISE**
    1. Stationlands 2 - proposed
      Developer: Qualico Developments
      Location: 101 Street & 105 Ave NW
      Number of floors: 26 (est)

    2. Manulife 2/ AIMCO tower - proposed
      Developer: AIMCO
      Location: 102 Street north of Jasper Ave
      Number of floors: 32 (est)


    3. Federal Building renovation & plaza expansion - Under construction
      Developer: Federal government & Alberta Infrastrucure
      Architect: Kasian
      General Contractor: Clark Builders
      Location: 98 st & 107-108 ave NW
      Number of floors: 10




    4. Quarters Hotel - Approved
      Location: 96 Street and Jasper Avenue
      Number of floors: 16


    5. Procura Hotel - Proposed
      Developer: Procura Real Estate
      Location: 99th Street south of Jasper Ave/ Adjacent to Hotel MacDonald
      Number of floors: 42 (est)


    6. The Metro - Approved
      Developer: Ironwood
      Architect: HIP Architects
      Location: 103 St &102 Ave NW
      Number of floors: 15


    7. Office tower on Jasper/102st - Proposed
      Developer: Melcor
      Location: Jasper Ave & 102 St NW
      Number of floors: 30-40


    8. Canterra Office Tower - Proposed
      Developer: Canterra Properties
      Location: Jasper Ave & 111 St NW
      Number of floors: 12

    9. Jasper 101 - Under construction
      Developer: GE Energy
      Location: Jasper Ave 101 Street



    **COMMERCIAL LOW RISE**
    1. 107 Street mixed use - Proposed
      Architect: Gene Dub
      Location: 104 Ave & 107 St NW
      Number of Floors: 11


    2. Alberta Hotel reconstruction - Under Construction
      Architect: Gene Dub
      Location: Jasper Avenue & 98 Street NW
      Number of Floors: 5


    3. Kelley-Ramsey Building restoration & addition - Proposed
      Developer: John Day
      Location: Rice Howard Way & 101A Ave
      Number of Floors: 6


    4. West Edmonton Mall Expansion- Proposed
      155,000 sqft expansion of retail space around Entrance 50 and east of the WaterPark
      West Edmonton Mall Parkade Expansion- Proposed
      WEM convention centre
      WEM WHL Hockey Arena
      This will include additional retail space, a facility for sports, trade shows and conventions, a 12-story office building, and a 600-unit apartment building, along with more parking.
      WEM Office Building - Proposed
      Location: West Edmonton Mall site
      Number of floors: 12
      WEM 2nd Hotel - Proposed
      Location: West Edmonton Mall site
      Number of floors: 12


    **HIGH RISE RESIDENTIAL**
    1. Century Park - Under Construction - Last News: full build out over many years
      Developer: Westbank Projects Corp and Procura
      Architect: James KM Cheng andATB Architecture
      Location: Former Heritage Mall Site, East side of 111th Street, North of 23rd Avenue


    2. Ulitma - Approved
      Architect:Ziola New Studio
      Developer: Westrich Pacific
      Location: 103 Street & 103 Ave NW
      Number of Floors: 32


    3. Westrich Pacific Condo Tower - Proposed
      Ziola New Studio
      Developer: Westrich Pacific
      Location: Unknown at this time
      Number of Floors: Unknown at this time


    4. Fox Towers - Proposed
      Brinsmead Kennedy Architecture
      Developer:Langham Developments Inc.
      Location:102 Ave & 104 St.
      Number of Floors: Tower 1 () Tower 2 ()



    5. 115th Street & 99 Ave Condo - Proposed
      Architect: Stantec
      Location: 115th Ave & 99 Street
      Number of Floors: 32 (est)
      [

    6. Boyle Street Renaissance Phase 2 - Proposed
      Architect: ATB Architecture
      Location: 95th Steet & 105th Ave NW
      Number of Floors: 10


    7. Beth Shalom- Our Parents' Home - proposed
      Architect: ATB Architecture
      Location: Jasper Avenue & 119 Street NW
      Number of Floors: 20

    8. Wild Rose Circle - approved
      Architect:Raimond Fung Architects
      Location:106 Ave. & 100 St.
      Number of Floors:11

    9. Pacific Rim Mall Redevlopment - Proposed
      Location: 97th Street & 105th Ave


    10. Caritas Fort Road Development - Proposed
      Location: Fort Road & 129th Street
      Number of Floors: 12


    11. Waterfall - Proposed
      Location: 111th Street & 98th Ave
      Number of Floors: 10


    12. Aurora – Approved
      Developer: Urban Landmarks
      Architect: Brinsmead Kennedy Architecture
      Location: 102 St to 104 St NW from 105 Ave-106 Ave
      Number of Floors:
      Building D: 28 Building E: 28
      Building F: 25 Building B: 23
      Building C: 23 Building A: 17






    13. Mayfair Village (North and South Buildings) - South (Completed) - North (Approved)
      Developer: Procura Real Estate Development
      Architect: ATB Architecture
      Location: 109 st & Jasper Ave NW, South east corner
      Number of floors: building 1- 16 building 2- 16


    14. Concert Properties Jasper Ave 124 st - Approved
      Developer: Concert Properties
      Location: 12424 Jasper Ave NW
      Number of floors: 26


    15. Glenora Skyline - Approved
      Architect: Brinsmead Kennedy Architecture
      Location: 142 Street & Stony Plain Road NW
      Number of floors:
      Tower 1: 17
      Tower 2: 13
      Tower 3: 11
      Tower 4: 11
      Tower 5: 8




    16. Strathern Heights - Approved
      Architect: Sturgess Architecture
      Number of floors:
      Tower 1: 19
      Tower 2: 17
      Tower 3: 17
      Tower 4: 17


    17. Opus - Approved
      Architect: Brinsmead Kennedy Architecture
      Location: 104 St & 98 Ave NW
      Number of Floors: 26


    18. Valleyview Tower - Approved
      Developer: Vinterra Properties
      Location: Jasper Ave & 96 St NW
      Number of floors: 16





    19. Dub Bellamy High Rise - Proposed
      Architect:Gene Dub
      Location:9847 Bellamy Hill (at 99 Ave)

      House/land at SE corner of Bellamy Hill and 99 Ave
    20. Azur Lofts- Approved
      Developer: Procura Real Estate Development
      Architect: ATB Architecture
      Location: Jasper Ave & 110 St NW
      Number of Floors: 17


    21. The Oliver- Approved
      Architect: CW Tse Architects and ISL Engineering and Land services.
      Location: 10024 110 Street
      Number of Floors: 14



    22. Cascadia - Proposed
      Developer: Procura Real Estate Development
      Architect: ATB Architecture
      Location: 109 st NW, between 100 Ave & Jasper Ave
      Number of floors: 14


    23. Parkwood Tower Proposed
      Architect: Brinsmead Kennedy Architecture
      Location: 105 St & 97 Ave NW
      Number of floors: 26




    24. 5th Avenue Vista Proposed
      Developer: Christenson Developments
      Architect: ATB Architecture
      Location: 105 Ave & 111-112 St
      Number of floors: 12


    25. Bellamy Hill Tower - Proposed
      Developer: Trans America Group
      Architect: Holland Roth Architects
      Location: Bellamy Hill
      Number of floors: 32


    26. Tango - Approved
      Architect: Brinsmead Kennedy Architecture
      Location: Jasper Ave & 84 St NW
      Number of floors: 26







    27. Rain Tree - Proposed
      Architect: Brinsmead Kennedy Architecture
      Location: East of Legislature Grounds
      Number of floors: 32



    28. 118th Street Apartments - Proposed
      Architect: W. Keith Rankin
      Location: 10135-118 STREET NW
      Floors: 12

    29. Clifton Place - Approved
      Location: High Street & Stoney Plain Road
      Brinsmead Kennedy Architecture
      Floors: 26 (est)


    30. Jasper High Rise - Approved
      Architect: HIP Architects
      Location: 8204 Jasper Ave NW
      Floors: 21


    31. The Edmontonian - Proposed
      Developer: BCM Developments Ltd
      Location: 101 St & 106 Ave NW
      Number Floors: 42


    32. Edgewater - low rise phase 1 Under Construction
      Developer: RK Developments
      Architect: Brinsmead Kennedy Architecture
      Location: 85 Street NW South of Commonwealth Stadium
      Number of Floors:
      Tower 1: 26
      Tower 2: 32


    33. The Pearl - Under Construction
      Architect: Brinsmead Kennedy Architecture
      Location: Jasper Ave & 119 St NW
      Number of Floors: 35



    34. Abbey Lane Tower - Proposed
      Location: 10406 98 Ave NW
      Number of Floors: 31



    35. Corner 1 Towers - Proposed
      Developer: BCM Developments Ltd
      Location: Jasper Ave & 95 St NW
      Number of floors: 22

    36. Charles Campsell Old Hospital site- Proposed
      Architect: DUB Architects
      Location: 12700 114 St NW


    37. Crown Plaza Condo Tower - Rumored
      Architect: Stantec
      Location: 100 Ave & 101 St NW
      Number of floors: 40 (rumoured)



    **LOW RISE COMMERCIAL/ GOVERNMENT/ RETAIL**
    1. Sherwood Park Community Centre - Under Construction
      Project includes construction of a library, council chambers, art space and other features.
      Developer: Strathcona County
      Location: Festival Ave and Sherwood Drive, Sherwood Park
      Number of floors: 2




    2. Windermere - Under Construction
      Developer: Harvard Developments
      Architect: Kasian
      Planner: Stantec
      Location: South of Anthony Henday, on Tewillegar
      Number of floors: Various


    3. 104 Street office - Approved
      Architect: Arndt Tkalcic Bengert
      Location: 10133-104 Street NW
      Number of floors: 6



    4. Coronation Plaza - Approved
      Location: 142 Ave 111 Sreet
      Number of floors: 4


    5. Boardwalk Market Redevelopment - Approved
      Architect: Stantec
      Location: 10310 102 Ave NW
      Number of floors: 4

    6. Westcorp Office - Proposed
      Developer: Westcorp
      Architect: Templar Architecture
      Location: 10013 101A Ave NW
      Number of floors: 4





    **LOW RISE RESIDENTIAL**
    1. Millcreek Park - Under Construction
      Developer:Parkwood Master Builder
      Location:8515 - 99 Street

    2. Center in the Park - Under Construction
      Developer: Christenson Developments
      Architect: ATB Architecture
      Location: Sherwood Park - Sherwood Drive near County Hall
      Number of floors: 4

    3. Fuzion on Whyte - Under Construction
      Developer:BCM Developments
      Location:82 ave. & 102 st.


    4. King Street on the Park – Under Construction
      Developer: Renoir
      Location: King Street, Spruce Grove
      Number of floors: 9



    5. Artisan CondoProposed
      Architect: Ziola NewStudio
      Location: 10903 111 Ave NW
      Number of floors: 4



    6. Allendale CondoProposed
      Architect: Brinsmead Ziola Kennedy Architecture
      Location: 6120 104 ST
      Number of floors: 6




    7. Essence- Proposed
      Developer: Time developments
      Location: south of jasper around 112 street



    **EDMONTON'S EDUCATIONAL, MEDICAL, RECREATIONAL, ENTERTAINMENT AND ARTS FACILITY CONSTRUCTION**


    UNIVERSITY OF ALBERTA
    University of Alberta South Campus Redevelopement - Proposed
    Location: University Lands near Neil Crawford Centre



    U of A Physical Activity and Wellness Centre - Proposed
    Architect:
    Location:87 ave. & 114 St.



    Edmonton Clinic Health Acadamy and Edmonton Clinic South - North (Completed) - South (Under Construction)
    Developer: University of Alberta/ Capital Health
    Architect: HOK Architects/ Callison Architects
    Location: W of 114street West of U of A
    Number of floors: South building= 8 North building = 6






    NORTHERN ALBERTA INSTITUTE OF TECHNOLOGY

    NAIT Centre for Applied Technologies (CAT) - Proposed
    Location: Gateway Blvd & 72 Street NW




    NAIT Ralph Klein campus - Proposed (Current NAIT expansion trends suggest that this project is indefinitely postponed or cancelled)
    Location: S of Ellersiele Rd, E of QEII




    OTHER EDUCATIONAL FACILITIES[list]
    • Grant MacEwan University City Center Campus Expansion
      Architect:
      Location:104 Ave & 105 St to 111St.


    • Grant MacEwan University Center For the Arts - Approved
      Architect:http://manascisaac.com/
      Location: 104 Ave & 111 St




    • Norquest College - 3 buildings Proposed
      Architect: Cohos-evamy
      Location: 103 ave 107/108st





    MEDICAL FACILITIES
    1. Royal Alexander Hospital New Orthopedic Clinic - Under Construction
      Location: 109A Ave & 102 St
      Number of floors: 6


    RECREATIONAL, ENTERTAINMENT AND ARTS FACILITIES


    New Edmonton Arena and District - Proposed
    Architect:360 Architecture
    Project Manager:Icon Venue Group
    Estimated start of construction 2013







    Royal Alberta Museum - Approved
    Architect: Dialog
    General Contractor: Ledcor
    Floors: 6
    Funding approved, construction potentially 2012 or 2013







    Ukrainian Canadian Archives & Museum of Alberta (UCAMA) Under Construction
    Architect: HIP Architects
    General contractor: Delnor Construction
    Location: Jasper Ave & 96 St
    Number of floors: 3


    Indigenous Centre for Arts and Knowledge
    Architect:
    Location:9515 107 Street (Current Location of the Terrace Building



    Telus World of Science Expansion - Under Construction
    Architect:



    Edmonton Valley Zoo Redevelopment - Under Construction



    **EDMONTON TRANSPORTATION AND INFRASTRUCTURE CONSTRUCTION**

    Edmonton International Airport
    2007 - 2012 Expansion Project
    An additional 13 bridges will be built on the south side of the terminal, boosting the total number of bridges to 30 from the current 17.
    Phase 1 (completion date 2010): 253,000 square metres of new apron space to accommodate new south terminal development.
    Phase 2 (completition date 2011): A new "hammerhead" located south of the current airport terminal.
    Phase 3 (completion date 2012): A new concourse linking the existing south terminal with the "hammerhead", new control & office tower.
    Source: Edmonton International Airport Expansion






    Airport Marriott - Under Construction
    Source: Edmonton International Airport Expansion



    Edmonton LRT Construction

    CFB Edmonton New Command Center - Under Construction
    Location:Edmonton Garrison



    Edmonton Freeway/Major Road Construction

    Walterdale Bridge Replacement - Approved
    Replacement for current Walterdale Bridge, construction to begin 2013.





    Anthony Henday North East - Under Construction
    http://www.transportation.alberta.ca/3787.htm
    Construction to start June 2012 and estimated completion in the fall of 2016



    Anthony Henday Stoney Plain Road Interchange
    Part of the NW portion of the AHD. Construction to start at fist phase of NW AHD
    Tenders due in 2008, Construction to start in 2009


    Edmonton Ports

    GreyHound / VIA Rail Hub
    Architect: O'Neill O'Neill Procinsky Architects
    Location: 121 Street and Yellowhead Trail at current Via Rail Station


    Port Alberta
    http://corporate.edmontonairports.co...t/port_alberta
    Location: Edmonton International Airport
    13,000 sq. metres of dedicated new cargo apron in 2007
    3,000 acres under development plan for 2008
    Last edited by Edmcowboy11; 15-06-2012, 10:30 AM.
    LRT is our future, time to push forward.

  • #2
    ^ thanks for carrying on a tradition I started many years ago The henday map at the end could be updated...
    A people that elect corrupt politicians, imposters, thieves and traitors are not victims, but accomplices.

    Comment


    • #3
      Thanks for updating the candy store!!

      Comment


      • #4
        We are missing grant mac.
        "Do you give people who already use transit a better service, or do you build it where they don't use it in the hopes they might start to use it?" Nenshi

        Comment


        • #5
          I will do some updates shortly. Unfortunately I had to go to work, but when I get back I will add or change any information to try and make it current.
          LRT is our future, time to push forward.

          Comment


          • #6
            ^job well done though!
            Thank You For Finally Going Higher!

            Comment


            • #7
              #4 is by Ziola New Studio for Langham Properties

              Comment


              • #8
                Originally posted by jdk13 View Post
                #4 is by Ziola New Studio for Langham Properties
                #3 is Ziola New Studio for Westrich

                #4 is BK for Langham


                Ottawa-Edmonton-Vancouver-Edmonton

                Comment


                • #9
                  Originally posted by IanO View Post
                  Originally posted by jdk13 View Post
                  #4 is by Ziola New Studio for Langham Properties
                  #3 is Ziola New Studio for Westrich

                  #4 is BK for Langham
                  you're right, my mistake

                  Comment


                  • #10
                    Originally posted by jdk13 View Post
                    Originally posted by IanO View Post
                    Originally posted by jdk13 View Post
                    #4 is by Ziola New Studio for Langham Properties
                    #3 is Ziola New Studio for Westrich

                    #4 is BK for Langham
                    you're right, my mistake
                    Is that for Ultima and Fox?

                    I've done some more updating, anyone please let me know if there is anything I missed or any incorrect information.
                    LRT is our future, time to push forward.

                    Comment


                    • #11
                      Caritas Fort Road Development - Proposed
                      Location: Fort Road & 139th Street
                      Number of Floors: 12


                      should be fort road and 129 ave
                      Edmonton Rocks Rocks Rocks

                      Comment


                      • #12
                        NAIT could be updated. I don't believe the Ralph Klein southern campus is still going through... and I believe the Souch addition is done.

                        Would be neat to see a link to each construction projects thread...
                        Last edited by Medwards; 12-06-2012, 06:49 PM.
                        A people that elect corrupt politicians, imposters, thieves and traitors are not victims, but accomplices.

                        Comment


                        • #13
                          EDM clinic south rendering is out of date. The current one could be found at one time on Genslers website ( I think)

                          Comment


                          • #14
                            Also, there are more current renderings for The Edmontonian out there as well as RK East.. Which is actually called Edgewater now

                            Comment


                            • #15
                              and Dub has that modular looking tower proposal in the valley. That would be a good addition.

                              Comment

                              Working...
                              X