Thread: Stantec Tower | 250.8 m, 823', 69 floors | under construction

  1. #4501

    Default

    Distance to the horizon 56.6 Kilometres

    http://www.ringbell.co.uk/info/hdist.htm

  2. #4502
    C2E SME
    Join Date
    Mar 2007
    Location
    Sherwood Park, AB
    Posts
    10,801

    Default

    I think trees prevent seeing the towers downtown, at some locations.
    "Talk minus action equals zero." - Joe Keithley, D. O. A.

  3. #4503

    Default

    Quote Originally Posted by kkozoriz View Post
    Distance to the horizon 56.6 Kilometres

    http://www.ringbell.co.uk/info/hdist.htm
    What about the horizon line? That is just the point where the sky meets land point. Tall objects Stantec will still stand out from that line- although quite small.
    " The strength of a man is in the stride he walks."

  4. #4504

    Default

    That distance is based on the height of 250.8 metres given in the thread title. From the top, you can see 56.6 km/ . Inversely, from the same distance, you should see the top of the tower.

    For example, at my height of 1.75 m, the horizon is about 4.7 km.

    Try different numbers and see what you get.

  5. #4505

    Default

    I understand what you were trying to say before you even uploaded all the information. All that info was part of my highschool art 10 class from highschool over 3 decades ago. I think you are explaining the "vanishing point."
    " The strength of a man is in the stride he walks."

  6. #4506
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default





    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  7. #4507

    Default

    3 residential floor left then 3 service floors. Should be topped by the end of August.

  8. #4508
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  9. #4509
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,365

    Default

    Quote Originally Posted by ctzn-Ed View Post
    Once it reaches the final height, i would assume it would be vissible about an hour's drive outside of the city as ur landscape is pretty much even elevation all around. It shouldn't be much different than our drive to Calgary where their towers are visible roughly an hour away.
    It's visible from the cemetery hill east of Ardrossan and near the Doppler radar station around Carvel

  10. #4510
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    6,731

    Default

    Calgaryís are down by the river with a hill in front. Coming in on the QE2 and Deerfoot you only see the top half of the skyscrapers. Coming into the Bow Valley on 17th from Forest Lawn and Bow Trail from the west are great views. Crescent Road on the north hill, Salisbury St. on Scotsmanís hill are great and from the south coming in over the hill of the Chinese cemetery on Macleod.
    Last edited by Drumbones; 07-07-2018 at 03:51 PM.

  11. #4511
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default


    @wherezjeff
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  12. #4512
    Becoming a C2E Power Poster
    Join Date
    Mar 2016
    Location
    Southwest YEG
    Posts
    201

    Default

    ^ Jeff Wallace is my favorite local photographer. His work is stunning. Thanks for sharing. Your pics are great as well IanO.

  13. #4513
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default

    He really is quite an amazing photographer.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  14. #4514

    Default

    They seem to be placing metal bracing on the elevator shaft on the east side in areas where they haven't put glazing. Anyone know what they might be doing here?

  15. #4515
    I'd rather C2E than work!
    Join Date
    Mar 2006
    Location
    Strathearn, Edmonton
    Posts
    4,222

    Default

    Quote Originally Posted by edmguy111 View Post
    They seem to be placing metal bracing on the elevator shaft on the east side in areas where they haven't put glazing. Anyone know what they might be doing here?
    Steel stud, exterior drywall, metal paneling.

  16. #4516
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default




    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  17. #4517
    Becoming a C2E Power Poster
    Join Date
    Oct 2013
    Location
    Oliver
    Posts
    277

    Default

    On the 65th floor now. 1 more residential floor, 3 mechanical floors, and this is topped off.

  18. #4518
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  19. #4519
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default


    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  20. #4520
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    46,250

    Default






    @ianoyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  21. #4521

    Default

    This aft.





  22. #4522

    Default

    Looking awesome
    "Do you give people who already use transit a better service, or do you build it where they don't use it in the hopes they might start to use it?" Nenshi