Page 28 of 28 FirstFirst ... 182425262728
Results 2,701 to 2,723 of 2723

Thread: Encore | Residential Tower | Under Construction| 43 floors - 138m

  1. #2701
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,968

    Default

    For safety I get that but for aesthetic reasons I hope both sides of the track (up to each Ave. dt) are not going to be gated off.
    Mom said I should not talk to cretins!

  2. #2702
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    49,104

    Default

    Will not be.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  3. #2703
    C2E Stole my Heart!!!!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    9,968

    Default

    Cool, thanks Ian. Your the best.
    Mom said I should not talk to cretins!

  4. #2704
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    49,104

    Default

    Hardly; just trying.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  5. #2705
    I'd rather C2E than work!
    Join Date
    Mar 2007
    Location
    City of Champions
    Posts
    7,538

    Default

    Whizzing by meaning 25 km/h

  6. #2706
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    49,104

    Default

    Having just been in Melbourne and Sydney with those running in many places at low speeds, this is something we should be looking forward to.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  7. #2707
    Becoming a C2E Power Poster
    Join Date
    Aug 2013
    Location
    Downtown Edmonton
    Posts
    249

    Default

    I can already imagine how frustratingly slow the LRT is going to feel crawling through DT.

  8. #2708
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    49,104

    Default

    It is a tram; quite urban, modern and appropriate for the setting.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  9. #2709

    Default

    Night shot from tonight...

  10. #2710
    Becoming a C2E Power Poster
    Join Date
    May 2012
    Location
    Virginia Park
    Posts
    265

    Default

    Quote Originally Posted by Aaron_Lloyd View Post
    I can already imagine how frustratingly slow the LRT is going to feel crawling through DT.
    I'm not sure I would want a street level LRT ripping through downtown at 50 km/h. Calgary's C-train doesn't move very fast in their downtown, either. Everywhere else 25km/h is going to be painfully slow.
    I will beat the dead horse back to life.

  11. #2711
    C2E Hard Core Contributor
    Join Date
    Sep 2006
    Location
    edmonton, alberta
    Posts
    2,319

    Default

    But it is not going to be travelling 25 Khmer everywhere else.

  12. #2712
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,823

    Default

    Quote Originally Posted by Doug View Post
    But it is not going to be travelling 25 Khmer everywhere else.
    Yes it will.

  13. #2713

    Default

    Quote Originally Posted by ChrisD View Post
    Quote Originally Posted by Doug View Post
    But it is not going to be travelling 25 Khmer everywhere else.
    Yes it will.
    Even in the areas where the line is completely separated from the road? That doesn't make sense, I can bike faster than 25 kmph.

  14. #2714
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    49,104

    Default

    It will run faster in most areas and often at the speed of traffic, ie. 40-60km/h.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  15. #2715
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,823

    Default

    Quote Originally Posted by barhonda View Post
    Quote Originally Posted by ChrisD View Post
    Quote Originally Posted by Doug View Post
    But it is not going to be travelling 25 Khmer everywhere else.
    Yes it will.
    Even in the areas where the line is completely separated from the road? That doesn't make sense, I can bike faster than 25 kmph.
    The low floor train will travel faster than 25 km/h outside downtown/main street areas, which is the majority of the line. I misinterpreted his comment.

  16. #2716

    Default

    My photo from today, podium front face (east) coming together.


    Last edited by Kreation; 01-11-2019 at 06:59 PM.

  17. #2717
    C2E Posting Power
    Join Date
    Feb 2008
    Location
    St. Albert, AB
    Posts
    654

    Default

    Quote Originally Posted by Kreation View Post
    My photo from today, podium front face (east) coming together.
    Thanks for the updates, Kreation. Great photos!

  18. #2718

    Default

    Yes, always look forward to Kreation's photo tours in my short time here

  19. #2719

    Default

    That is a superb set of updates Kreation! Much needed on this forum, thanks for doing it.
    Edmonton first, everything else second.

  20. #2720

    Default

    Quote Originally Posted by Kreation View Post
    My photo from today, podium front face (east) coming together.


    the last photo is proof that you don't have to be up high to still have a great view!

  21. #2721

    Default

    I'm interested to see what the LED lighting feature at the top will look like. Hope it stands out in the skyline at night.

  22. #2722

  23. #2723
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,823

    Default

    Quote Originally Posted by ronron View Post
    I'm interested to see what the LED lighting feature at the top will look like. Hope it stands out in the skyline at night.
    Yeah, that'll be sweet.

Page 28 of 28 FirstFirst ... 182425262728

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •