Thread: Encore | Residential Tower | Under Construction| 43 floors - 138m

  1. #1301

    Default

    ^ not necessarily, may just be indicative of the total height increase we already knew about. Would love a taller podium though.
    Let's make Edmonton better.

  2. #1302
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton Downtown Core
    Posts
    4,326

    Default

    What was previously denied only due to the lack of authority vested by the City to its staff) and now approved:

    "To construct an addition (increase of Dwellings from 179 to 188 units on a new loft floor and adding an interconnected mezzanine floor that connects to the General Retail Use units within the main floor podium; and adding a penthouse mezzanine floor within the Dwelling unit on the 40th floor); and to construct exterior and interior alterations to a mixed-use development Apartment Housing and main floor General Retail Uses."

    Appellant stated: "The Appellant noted under the second permit approval, additional Height was approved, but FAR was not exceeded in an effort to control building massing. Under this permit, there are no changes to building form; there are only internal changes to the podium. There is no change to the previously approved Height."

    What the change in height was that was approved in the second permit approval is not stated in this document - though it may be posted way down on this thread somewhere. I am still confused exactly how many floors including mechanical floor that this project will be: is it 43 including mechanical and 138m per the header and that is what was on that second permit approval wrt regard to height??
    Last edited by EdmTrekker; 22-07-2016 at 12:47 PM.

  3. #1303
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    Looks to be just under 140m. Top most occupied level is 43, plus several levels of mechanical/elevator.

  4. #1304

    Default

    Job No 178097506-003
    Description: To install (1) Freestanding On-premises Sign (Encore Tower), existing without permits.
    Location: 10180 - 103 STREET NW
    Plan NB1 Blk 3 Lots 209-210
    Applicant: WESTRICH ENCORE INC.
    Status: More Intake Info Requested
    Create Date: 8/26/2016 3:47:15 PM

  5. #1305
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Keep it active, moving forward.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  6. #1306

    Default

    Bump. Any news on this now that Ultima is close to complete?

  7. #1307

    Default

    ^ anyone care to venture into their sales office and check out the % sold? Perhaps they've gotten closer to 60%?

    I think the problem here is similar to the Jasper House, the remaining units in the Encore are all in the $500,000+ range. Personally, it's a lot of dough for a condo once you're around half mill mark, I'd sacrifice the location and find a duplex infill in a neighbourhood like Bonniedoon.

  8. #1308
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,665

    Default

    I went in there just the other day. Not much movement. I believe they said they were just over 40% sold? They're looking at summer of next year now, so it looks like they're starting to push back the date. We'll see what happens.

  9. #1309
    C2E SME
    Join Date
    Mar 2006
    Location
    Edmonton, Alberta
    Posts
    10,562

    Default

    This is definitely one project I want to see move forward as it will fill a very significant empty lot in the heart of the core.
    LRT is our future, time to push forward.

  10. #1310
    C2E Continued Contributor
    Join Date
    Apr 2010
    Location
    Edmonton
    Posts
    1,372

    Default

    ^ Agreed! This one, Jasper House, and the MacLaren are the three I want to see built the most. And in that order too

  11. #1311
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,267

    Default

    ^MacLaren is underway.

  12. #1312
    C2E Hard Core Contributor
    Join Date
    Jan 2012
    Location
    Sherwood park
    Posts
    2,262

    Default

    Is it? Isn't that the one where they are demolishing the historic building?

  13. #1313

    Default

    Sortof depends how one defines "underway."
    Let's make Edmonton better.

  14. #1314
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    5,824

    Default

    Well getting a start anyway. Better than Jasper House for sure.

  15. #1315

    Default

    Bump. Any word on this one?

    Second deposits should be due soon.

  16. #1316
    C2E Long Term Contributor
    Join Date
    Mar 2006
    Location
    Downtown
    Posts
    30,036

    Default

    Still going ahead AFAIK
    “You have to dream big. If we want to be a little city, we dream small. If we want to be a big city, we dream big, and this is a big idea.” - Mayor Stephen Mandel, 02/22/2012

  17. #1317

    Default

    The Encore is more than tall enough for me. i'd just like to see shovel meeting ground and get the thing going already!

  18. #1318

    Default

    For some period (basically from the moment Legends started selling) sales hit a plateau. Not sure if they're still on that plateau or not.
    Let's make Edmonton better.

  19. #1319
    Administrator *
    Join Date
    Nov 2011
    Location
    Queen Mary Park, Edmonton
    Posts
    2,665

    Default

    Spoke to their sales centre. They're hoping to get construction started in January now for both this tower and Signature Tower 3. We'll see what happens.

  20. #1320

    Default

    That would be fantastic. 103 Street would take another massive stride.
    Let's make Edmonton better.

  21. #1321

    Default

    ^^ I'll believe it when I see it haha. They are getting second deposits in for the people who pre-bought last year.

  22. #1322
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    5,824

    Default

    A company whose business is developing projects needs to build projects to keep going! Why not?

  23. #1323

    Default

    Are they still building in house or are they using an external GC now?

  24. #1324
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    Still acting as their own GC, but apparently they will be self-performing much less sub-trade work (drywall, cribbing, etc).

  25. #1325

    Default

    In other words, expect better quality on this compared to their previous projects?

  26. #1326

    Default

    sub trades or not its still on westrich for the quality they put out.. not sure why you think anything would change.

  27. #1327
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    Quote Originally Posted by barhonda View Post
    In other words, expect better quality on this compared to their previous projects?
    I can't really comment on that, as I have little knowledge of their past projects and how they turned out. But I think it's safe to say some lessons have been learned.

  28. #1328

    Default

    Back on November 10th they were onsite with a vac truck. There is a metal plate covering the hole now, its in the South East corner of the parking lot. I asked and was told it was a test hole to check what was underground near the surface at the property line, they indicated that digging was starting in the spring?

    A few of the onsite Ultima crew have been moved to Signature Tower 3 this week.

  29. #1329
    C2E Posting Power
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    944

    Default

    I got an email from the Encore site regarding ultima They have sales on for a penthouse overlooking ice district for 162,000 dollars off.

  30. #1330

    Default

    Quote Originally Posted by gwill211 View Post
    sub trades or not its still on westrich for the quality they put out.. not sure why you think anything would change.
    Lots could change. There are many experienced carpenters right now as the boom is no more. They learned from their rookie years.

  31. #1331

    Default

    Few nights ago:

    Let's make Edmonton better.

  32. #1332

    Default

    Quote Originally Posted by Stevey_G View Post
    I got an email from the Encore site regarding ultima They have sales on for a penthouse overlooking ice district for 162,000 dollars off.
    My friend looked at that unit and said it looked nice, but the floor felt slanted. Should bring a level and revisit.

  33. #1333

    Default

    I cant see that as they have to be level when slabform is built prior to the pours. Even if the bubble is not precisely centreed, there is no way one can feel slants. If that is true, somebody failed rudimentary carpentry.

  34. #1334

    Default

    Construction to start in the new year according to encore sales email today.

  35. #1335

    Default

    2021 will be a turning point for downtown. Ice District Phase 1 fully complete. 104 street basically built out. The LRT (read tram) operating between Mill Woods and City Centre. And Encore newly completed (if they do break ground early next year).

  36. #1336

    Default

    Really great to know that.

  37. #1337

    Default

    Job No 134240188-012
    Description: To decrease the number of Dwellings from 188 to 179 (conversion of 9 Dwellings on 3rd Storey to Professional, Financial and Office Support Services) and to add a General Retail Stores Use to the main floor; and to construct exterior alterations (screened mechanical equipment on podium roof along lane) - Encore Condominiums.
    Location: 10180 - 103 STREET NW
    Plan NB1 Blk 3 Lots 209-210
    Applicant: WESTRICH ENCORE INC.
    Status: To Be Assigned
    Create Date: 12/9/2016 10:20:11 AM

  38. #1338

    Default

    I thought the 3rd floor units were sold out? Unless they are bumping everyone up one level

  39. #1339
    Becoming a C2E Power Poster
    Join Date
    Apr 2007
    Location
    Calgary, Alberta
    Posts
    112

    Default

    ^^Podium to be expanded and overall height to increase slightly?

  40. #1340
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Still moving forward internally at the City...
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  41. #1341

    Default

    Any news on this??

  42. #1342
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    It's getting very close, I believe.

  43. #1343
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Hearing the same thing. March.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  44. #1344
    C2E Posting Power
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    944

    Default

    This is really going to tie this entire area together. Very very limited staging ground though so I'll be curious to see how fast it goes up.

  45. #1345
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Curb parking lanes on 103st and 102ave
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  46. #1346

    Default

    Quote Originally Posted by Stevey_G View Post
    This is really going to tie this entire area together. Very very limited staging ground though so I'll be curious to see how fast it goes up.

    Agreed, with this and ICE, almost nothing left to want on 103 but City Centre Mall...

    Going to be fantastic.
    Let's make Edmonton better.

  47. #1347
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton, Alberta
    Posts
    4,177

    Default

    I think I owe someone a coffee.
    “Canada is the only country in the world that knows how to live without an identity,”-Marshall McLuhan

  48. #1348
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,267

    Default

    I'd like to see this one break ground. While a small site, it fills an important gap on the block.

  49. #1349

    Default

    ^It certainly does. Will connect 104 Street to the CBD with a bit more retail.
    www.decl.org

  50. #1350

    Default

    DavidEwasukCTV ‏@DavidEwasukCTV

    Developer of Ultima Tower says excavation set to begin on taller Encore project on same street. #yegdt

    https://twitter.com/DavidEwasukCTV/s...46118289645568

  51. #1351
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Excellent. Critical corner to get developed.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  52. #1352
    Becoming a C2E Power Poster
    Join Date
    Apr 2013
    Location
    Downtown Edmonton
    Posts
    128

    Default

    I will have an excellent view of this, my unit in the Ultima is on the 10th Floor facing the Encore site. I'll provide weekly updates for you guys!

    Also great presser today Ian!

  53. #1353
    C2E Posting Power
    Join Date
    Jun 2013
    Location
    Downtown
    Posts
    818

    Default

    Will be interesting to see the disruption to the rear parking entrance for us in Phillips...
    YEG lifer. Phillips liver.

  54. #1354

    Default

    Sales center moving to Ultima according to the website

  55. #1355

    Default

    Here's hoping they accommodate pedestrian movement.

  56. #1356

    Default

    Here's another tweet.

    DavidEwasukCTV@DavidEwasukCTV 8m8 minutes agoMore



    View from penthouse in Ultima Tower as developer confirms taller Encore Tower to begin within 30 days. #yegdt


    https://twitter.com/DavidEwasukCTV/s...73175795085312

  57. #1357

    Default

    ^taller is better.

  58. #1358

    Default

    Looks like it's going to be 43 floors.

    Correct me if I'm wrong, but Stantec Tower, J.W Marriott, Encore, and Ice District Tower B will be taller than anything Edmonton has right now (Manulife Place present tallest)?

  59. #1359
    I'd rather C2E than work!
    Join Date
    Mar 2010
    Location
    Edmonton area.
    Posts
    5,824

    Default

    I think Manulife is 147 meters

  60. #1360

    Default

    Don't think this vid has been posted before... found on their website:



    http://encoretower.com/location

    EDIT: NVM it was posted back in 2015...
    Last edited by lat; 17-02-2017 at 08:07 AM.

  61. #1361

    Default

    Another parking lot gone! Love it!

  62. #1362
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    One of the most important lots/corners to be developed for our Downtown.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  63. #1363
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    Quote Originally Posted by Bodmanza
    Will be interesting to see the disruption to the rear parking entrance for us in Phillips...


    I foresee many arguments with truck drivers and equipment operators in my future.

  64. #1364

    Default

    Quote Originally Posted by Marcel Petrin View Post
    Quote Originally Posted by Bodmanza
    Will be interesting to see the disruption to the rear parking entrance for us in Phillips...


    I foresee many arguments with truck drivers and equipment operators in my future.
    Don't get run over!

  65. #1365
    I'd rather C2E than work!
    Join Date
    Feb 2006
    Location
    Edmonton, AB
    Posts
    7,267

    Default

    Quote Originally Posted by IanO View Post
    Excellent. Critical corner to get developed.
    Vibrancy

  66. #1366

    Default

    Densification as well, and optical for South view.

  67. #1367
    C2E Posting Power
    Join Date
    Jun 2013
    Location
    Downtown
    Posts
    818

    Default

    Quote Originally Posted by Marcel Petrin View Post
    Quote Originally Posted by Bodmanza
    Will be interesting to see the disruption to the rear parking entrance for us in Phillips...


    I foresee many arguments with truck drivers and equipment operators in my future.
    You get'em Marcel. Personally, I'll probably mutter under my breath and stew for hours on my own
    YEG lifer. Phillips liver.

  68. #1368

    Default

    Any word on if Westrich is going to be their own GC again?

  69. #1369
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    See earlier post:

    Quote Originally Posted by Marcel Petrin View Post
    Still acting as their own GC, but apparently they will be self-performing much less sub-trade work (drywall, cribbing, etc).

  70. #1370

    Default

    ^thanks Marcel

    Quote Originally Posted by barhonda View Post
    Here's another tweet.

    DavidEwasukCTV@DavidEwasukCTV 8m8 minutes agoMore



    View from penthouse in Ultima Tower as developer confirms taller Encore Tower to begin within 30 days. #yegdt


    https://twitter.com/DavidEwasukCTV/s...73175795085312
    30 days is coming up soon.... Should this start next week?

  71. #1371
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    ^ I haven't been in the area recently, so I can't say. Mid month is fast approaching. Is anything on going with this project like hoarding or anything, anyone?
    Mom said I should not talk to cretins!

  72. #1372

    Default

    On the way to the game last night, people were still using it for parking and it looked mostly full.

  73. #1373

    Default

    Yes, nothing new since the test hole in the South East corner of the lot. A metal plate covers it now.

  74. #1374
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    After several months of literally being a hole with dirt piled beside it. I'm probably a bit bitter about that, given that they broke the asphalt and dug the hole at 10-11pm on a Sunday. After blocking the alley for an hour with a semi.

  75. #1375

    Default

    Can't take a developers word for anything these days...

  76. #1376
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Within the next month I am hearing.



    https://twitter.com/IanOyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  77. #1377
    C2E Posting Power
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    869

    Default

    ^Is that not what they said last month though?

  78. #1378

    Default

    They're probably not in a rush. This lot is printing money. Full during work hours. Full during event hours.

    They also just commenced on the Windermere tower, regardless of whether or not they'll be the GC, they're probably getting their ducks in a row before allocating resources to this job.

  79. #1379
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    The reality is that these things take considerable time and effort with MANY moving parts... a few weeks either side is not a big deal.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  80. #1380
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    Another emerald tower type stall job?
    Mom said I should not talk to cretins!

  81. #1381
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Hardly. Things are complicated and take a bit of time, that's all.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  82. #1382

    Default

    They do, but they shouldn't really be telling the media "within 30 days" if it's going to take longer.

    I find that condo developers are horrible in terms of wishy-washy start up dates, possession dates, etc.

  83. #1383
    C2E Stole my Heart!!!!
    Join Date
    Dec 2009
    Location
    Downtown Edmonton
    Posts
    9,543

    Default

    Quote Originally Posted by envaneo
    Another emerald tower type stall job?


    As usual, you don't know what you're talking about. They only received their zoning approval last June. To that point, no detailed design would have even commenced. These things take time.

    Quote Originally Posted by barhonda
    I find that condo developers are horrible in terms of wishy-washy start up dates, possession dates, etc.


    Ultimately, they're in sales. Always take whatever a salesman says with a big grain of salt, no matter the industry. Developers have to be optimistic by definition.

  84. #1384
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Not to mention that it was only but a few years ago, ok maybe a decade, where pre-sales would go on for 1-2 years min. for larger projects.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  85. #1385

    Default

    My building was 70% sold the day before sales officially opened, a little over 10 years ago.
    Giving less of a damn than ever… Can't laugh at the ignorant if you ignore them!

  86. #1386
    C2E Posting Power
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    944

    Default

    Quote Originally Posted by Marcel Petrin View Post
    Quote Originally Posted by envaneo
    Another emerald tower type stall job?


    As usual, you don't know what you're talking about. They only received their zoning approval last June. To that point, no detailed design would have even commenced. These things take time.

    Quote Originally Posted by barhonda
    I find that condo developers are horrible in terms of wishy-washy start up dates, possession dates, etc.


    Ultimately, they're in sales. Always take whatever a salesman says with a big grain of salt, no matter the industry. Developers have to be optimistic by definition.
    This is something I have to remind people about every day. It's remarkable.

  87. #1387
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Quote Originally Posted by noodle View Post
    My building was 70% sold the day before sales officially opened, a little over 10 years ago.
    My building was in sales for 3 years, many were that or more and often had many units avail at completion.
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  88. #1388
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    Quote Originally Posted by Marcel Petrin View Post
    Quote Originally Posted by envaneo
    Another emerald tower type stall job?


    As usual, you don't know what you're talking about. They only received their zoning approval last June. To that point, no detailed design would have even commenced. These things take time.

    Quote Originally Posted by barhonda
    I find that condo developers are horrible in terms of wishy-washy start up dates, possession dates, etc.


    Ultimately, they're in sales. Always take whatever a salesman says with a big grain of salt, no matter the industry. Developers have to be optimistic by definition.
    Excuse me but I'm just going by what the media apparently reported. You over react to much, as usual.
    Mom said I should not talk to cretins!

  89. #1389
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    Quote Originally Posted by IanO View Post
    Quote Originally Posted by noodle View Post
    My building was 70% sold the day before sales officially opened, a little over 10 years ago.
    My building was in sales for 3 years, many were that or more and often had many units avail at completion.
    Thanks Ian, I get all that.

    Encore has been in sales since ~ 2015 if not earlier. I was going by what I heard on television around February 18th or there abouts.

    Can't seem to find anything but can anyone confirm the origins of this story of a Encore crane or construction beginning at the end of March?

    Thanks.
    Mom said I should not talk to cretins!

  90. #1390
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    Never mind, I think this is it: And this story doesn't say anything about a crane in the ground by the end of this month. And here is an earlier tweet:

    https://twitter.com/DavidEwasukCTV/s...73175795085312

    The story:

    http://edmonton.skyrisecities.com/news/2017/02/encore-tower-start-work-march

    Last edited by envaneo; 15-03-2017 at 12:56 PM.
    Mom said I should not talk to cretins!

  91. #1391

    Default

    Quote Originally Posted by Marcel Petrin View Post
    After several months of literally being a hole with dirt piled beside it. I'm probably a bit bitter about that, given that they broke the asphalt and dug the hole at 10-11pm on a Sunday. After blocking the alley for an hour with a semi.
    dont expect much sympathy from others when it comes to construction. When i posted how bad westrich was in ambleside for the first tower i was the problem.

    Hopefully theyve learned that they cant do anything they want during construction.

  92. #1392
    I'd rather C2E than work!
    Join Date
    May 2008
    Location
    Clareview
    Posts
    7,113

    Default

    My post #1380 was a question not a statement of fact. its amazing how some posters here have "selective hearing."
    Mom said I should not talk to cretins!

  93. #1393
    C2E Long Term Contributor
    Join Date
    Feb 2006
    Location
    Downtown Edmonton
    Posts
    43,983

    Default

    Site being blocked off for site prep we can only presume.


    https://twitter.com/IanOyeg
    www.decl.org

    Ottawa-Edmonton-Vancouver-Edmonton

  94. #1394

  95. #1395
    C2E Posting Power
    Join Date
    Jul 2015
    Location
    Downtown Edmonton
    Posts
    944

    Default

    It is happening.

  96. #1396

    Default

    With the outcome of Ultima, I think this one is much anticipated.
    " The strength of a man is in the stride he walks."

  97. #1397
    I'd rather C2E than work!
    Join Date
    Jul 2006
    Location
    Edmonton, Alberta
    Posts
    4,177

    Default

    Drove by today and I did not even notice.

  98. #1398

    Default

    I'm curious with how they will construct their hoarding with such limiting real estate. Perhaps a lesson learned through Mayfair?

  99. #1399
    C2E Posting Power
    Join Date
    Sep 2013
    Location
    I don't even know anymore :/
    Posts
    869

    Default


  100. #1400

    Default

    Quote Originally Posted by ctzn-Ed View Post
    I'm curious with how they will construct their hoarding with such limiting real estate. Perhaps a lesson learned through Mayfair?
    Hopefully.

    There is also the possibility of borrowing the strip of land between this and Beaver House.

    Either way, hoping not another awful full construction cycle a'la Fox.
    Let's make Edmonton better.

Page 14 of 17 FirstFirst ... 41011121314151617 LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •